Hospital São Luiz: patient bathroom leak repair
Demolition of floor tiles, wall tiles and skirting, removal and refitting of fixtures, and asphalt membrane waterproofing. New render and 12.76 m² of relaid porcelain tiles, structural repair with rebar treatment and grout, plaster ceilings redone in two consulting rooms, and general repainting.
- Client
- Hospital São Luiz (Grupo Kora Saúde)
- Location
- Ibes, Vila Velha
- Dates
- Jun 2021
- Status
- Completed
Quantities and quality control
| Item | Unit | Quantity |
|---|---|---|
| Waterproofing with 4 mm bituminous membrane | m² | 10 |
| Demolition of wall tiling / removal of old plaster | m² | 12.76 |
| Porcelain floor tile installation | m² | 12.76 |
| Structural repair (scarification, rebar treatment and grout reinstatement) | m² | 2.88 |
| Plasterboard ceiling repair | m² | 2.88 |
Source: progress reports and project records.