Skip to content
PCR ENGENHARIA E INCORPORAÇÃO, home page

Hospital São Luiz: patient bathroom leak repair

Demolition of floor tiles, wall tiles and skirting, removal and refitting of fixtures, and asphalt membrane waterproofing. New render and 12.76 m² of relaid porcelain tiles, structural repair with rebar treatment and grout, plaster ceilings redone in two consulting rooms, and general repainting.

Client
Hospital São Luiz (Grupo Kora Saúde)
Location
Ibes, Vila Velha
Dates
Jun 2021
Status
Completed
Quantities and quality control
ItemUnitQuantity
Waterproofing with 4 mm bituminous membranem²10
Demolition of wall tiling / removal of old plasterm²12.76
Porcelain floor tile installationm²12.76
Structural repair (scarification, rebar treatment and grout reinstatement)m²2.88
Plasterboard ceiling repairm²2.88

Source: progress reports and project records.

Similar projects

Institutional