Hospital Metropolitano: renovation of 38 bathrooms
Removal of fixtures, demolition of 1,468.80 m² of wall tiling and 219.60 m² of flooring, and 798 m² of substrate levelling. New ceramic wall tiling and 171 m² of floor tiles, skirting, thresholds, granite vanities with basins and granite partitions, materials and labour included.
- Client
- Hospital Metropolitano (Grupo Kora Saúde)
- Location
- Civit II, Serra
- Dates
- Sep 2021
- Status
- Completed
Quantities and quality control
| Item | Unit | Quantity |
|---|---|---|
| Bathrooms renovated | und | 38 |
| Ceramic wall cladding, laid (including grout) | m² | 922.26 |
| Substrate leveling for cladding (3 cm) | m² | 798 |
| Ceramic floor tiling, laid | m² | 171 |
| Ceramic wall cladding demolition | m² | 1,468.80 |
| Ceramic floor tile demolition | m² | 219.60 |
| White Itaúnas baseboard 10 cm | m | 248.52 |
| Granite partitions 0.60x1.80 | und | 38 |
Source: the project's progress reports.