Lion D'Or Building: renovation after building inspection
Lump-sum contract covering crack repair, localised structural repair and painting of facades, garages, ramps and service areas. Concrete copings replaced with granite copings with drip edges, 372.9 m of frames and joints sealed, and roof waterproofed with asphalt membrane. Carried out from January to August 2022.
- Client
- Condomínio do Edifício Lion D'Or
- Location
- Santa Helena, Vitória
- Dates
- Jan 2022 - Aug 2022
- Intervention area
- 2,688.17 m²
- Status
- Completed
Quantities and quality control
| Item | Unit | Quantity |
|---|---|---|
| Building facades and sides: high-pressure washing | m² | 3,735.90 |
| Building facades and sides: PVA latex paint including sealer | m² | 3,735.90 |
| Ground floor garage: wall painting | m² | 1,360 |
| Ground floor garage: ceiling painting | m² | 456.90 |
| Garage level G: wall and ceiling painting | m² | 770.15 |
| Right-side boundary wall (Ed. Carrara D'Itália): washing and acrylic paint | m² | 559.90 |
| Front facade (entrance): skim coat and acrylic paint | m² | 212.45 |
| Polished grey granite coping 30 cm with drip edge, pilotis garage | m² | 58.40 |
Source: the project's progress reports.